View Single Post
Old 09-14-2008, 10:03 PM   #1 (permalink)
sarmenhb
The Addict
 
sarmenhb's Avatar
 
Join Date: Jan 2008
Location: los angeles
Posts: 309
Thanks: 44
sarmenhb is on a distinguished road
Default help me figure out this date thing

i created this application where a user signs up for something what i want to do is the second the user signs up the date that is inserted into the db is 3 weeks ahead of the signup date for example.

if i signed up on the application todays date would be 9/14/2008 and the date that is inserted into the database would be 10/5/2008 (which is 3 weeks ahead of the sign up date)

how would this be codded???
thanks
__________________
no signature set
sarmenhb is offline  
Reply With Quote